Coil Tubing Equipment

Control Cabin

  • Electronic and hydraulic controls
  • Real-time data acquisition
  • 4-station closing unit

Tubing Work Reel

  • Wide variety of depths and tubing sizes capable of servicing up to 14000 ft in depth
  • Depth encoder for accurate depth readings
  • High pressure inlet iron

Tubing Injectors

  • 20,000 lb and 35,000 lb Injector Heads
  • 5/8” to 1” tubing sizes
  • 72” arch radius
  • Infinite depth rate control
  • NACE spec stripper assembly with 10,000 psi working pressure

COIL APPLICATIONS

CLEANOUTS

Coiled tubing can be used to remove scale, produced sand, frac sand and debris from the wellbore. Coiled tubing is run into the wellbore, fluid is pumped down the coiled tubing and returns are circulated through the annulus. Coiled tubing can rig up and get to depth quickly without killing the well or pull the production tubing.

NITROGEN INJECTION

Coiled tubing allows the injection of nitrogen at depth into a dead wellbore to displace the wellbore fluid with nitrogen. This lowers the bottom hole pressure and allows the well to resume flowing.

STIMULATION

Coiled tubing treatments are designed to restore the natural permeability of the near-wellbore formation by injecting treatment fluids into the formation. Coiled tubing stimulation can be performed on live wells and combined with other operations such as nitrogen injection.

PRODUCTION ENHANCEMENT

  • Acid Stimulation
  • Paraffin Removal

CRITICAL WELL APPLICATIONS

  • CO2 and H2S Services
  • High Temperature and Pressures

WORKOVER APPLICATIONS

  • Backwashing
  • Milling
  • Sand Washing
  • Solid Removal
  • Thru-Tubing Fishing
  • Well Circulation
  • Foam Washing with Nitrogen
  • Deployment of Downhole Pumps and Cameras

DRAG & BUCKLE AND TUBING FORCE ANALYSIS SOFTWARE

Drover Energy has full engineering capabilities for drag and buckle, determining the required surface equipment for the job, as well as downhole tool design and optimization. With full pre-job planning and fluid analyses, the job becomes safer and more efficient, leading to better results for the customer. The onboard data acquisition system monitors tubing life for proper string retirement before failure.


With pre-established operating limits calculated from job-to-job, operations are conducted within the limits of the equipment, field personnel work smarter, and the well is left in a better state than when started.



© Drover Energy Services, L.L.C.
Kilgore, TX 75662

Responsive website by GroupM7 Design™