One Phone Call - Less Hassle - Complete Job Design And Installation
Single and Dual Spooling Equipment
FRAC HIT Monitoring Gauge Packages
Capillary Services
Live Well Installations (Through-Tubing)
Variety of Tech Cable and Capillary Alloys
Surface Data Components
- TEC Cable & Capillary Provided
- New Well Installations
- Workover Pull & Reinstall Services
- Pre-Job Planning & Technical Support
- Dual Banding Trailer – TEC & Capillary
- Sub-Mandrels, Clamps, Magnetic Bands
- Pressure/Temperature Gauges - 5K/10K
- Surface Data Acquisition Components
Dual Spooling Installations
- Smaller Footprint on Location
- Quick Call out and Planning
- Combo TEC & Capillary Trailers
- Job Cost Savings
Concentric
Through-Tubing Installations
- Precise Delivery of Gauge or Chemical Downhole
- Install Packages for FRAC “HIT” Monitoring
- Average Installation 4 Hours
- No Pulling Units / Eliminates Well Downtime
- Proven Alloys in High Pressure / Severe Wells
- More than 10,000 Successful Installations
- Easily Installed Multiple Times for Other Wells
- Typical TEC / BHP Gauge Installations:
Frac Monitoring, Spacing, Optimization in Lifting Methods, Well Communication, Disposal Well Distribution and Evaluation
Safety Training and Personnel
✓ Well Control School Certification
✓ Safe-Land & Extensive Safety Training
✓ Drover PPE and Operator Safety
✓ Extensive JSA & SOP for Each Job
✓ I. S. Net World Member
✓ 350 + Master Service Agreements
Off Back Dual Banding Trailer
- Self-contained, hydraulically-powered spooler
- Lifting-certified sheaves and rigging
- 7,000 psi test pump
- Fluid swivel and electrical commutating shafts for continuous injection and gauge monitoring.
6 Capillary Units in Domestic Fleet
Permian & DJ Basin TEC & Gauge Installation
- Flanged Lubricator
- Installed Live Well Conditions
- 10K Flanged 3 Barrier Pack-Off Assembly
- Pressure Differential Communication w/SCADA
Capillary & TEC Install Components
Single & Dual Top of Tree Pack-Off Designs
Threaded
Flanged
Single Barrier
Dual Barrier
5K & 10K
Chemical Injection Valve or Pressure Gauge
Inconel Body
17-4 Body
Inconel Spring
Carbide Ball & Seat
Proven Success
4' Sub Injection Mandrel - Certified Pressure Tested at Shop and Location
Reservoir Monitoring with Downhole Pressure & Temperature Gauges
Reservoir Evaluation
- Real Time Pressure Draw Down
- Optimize Well Spacing
- Monitor Permeability
- Evaluate Reservoir Decline
Production Evaluation
- Efficiencies in Lifting Methods
- Identify Depth of Gas Breakout
- Ratios of Gas, Oil & Water
- Identify Production Optimization
Completion Evaluation
- Detection of Casing Leaks
- Efficiency of Frac Jobs
- Zone Performance and Isolation Results
- Monitor Steam Injection Productivity