One Phone Call  -  Less Hassle  -  Complete Job Design And Installation


  • Single and Dual Spooling Equipment

  • FRAC HIT Monitoring Gauge Packages

  • Capillary Services

  • Live Well Installations (Through-Tubing)

  • Variety of Tech Cable and Capillary Alloys

  • Surface Data Components


Banding Services

  • TEC Cable & Capillary Provided
  • New Well Installations
  • Workover Pull & Reinstall Services 
  • Pre-Job Planning & Technical Support
  • Dual Banding Trailer – TEC & Capillary
  • Sub-Mandrels, Clamps, Magnetic Bands
  • Pressure/Temperature Gauges - 5K/10K
  • Surface Data Acquisition Components

Dual Spooling Installations

  • Smaller Footprint on Location
  • Quick Call out and Planning
  • Combo TEC & Capillary Trailers
  • Job Cost Savings

Concentric

Through-Tubing Installations

  • Precise Delivery of Gauge or Chemical Downhole
  • Install Packages for FRAC “HIT” Monitoring
  • Average Installation 4 Hours
  • No Pulling Units / Eliminates Well Downtime
  • Proven Alloys in High Pressure / Severe Wells
  • More than 10,000 Successful Installations
  • Easily Installed Multiple Times for Other Wells
  • Typical TEC / BHP Gauge Installations:
    Frac Monitoring, Spacing, Optimization in Lifting Methods, Well Communication, Disposal Well Distribution and Evaluation

Safety Training and Personnel

Well Control School Certification

Safe-Land & Extensive Safety Training

Drover PPE and Operator Safety

Extensive JSA & SOP for Each Job

I. S. Net World Member

350 + Master Service Agreements

Off Back Dual Banding Trailer

  • Self-contained, hydraulically-powered spooler
  • Lifting-certified sheaves and rigging
  • 7,000 psi test pump
  • Fluid swivel and electrical commutating shafts for continuous injection and gauge monitoring.

6 Capillary Units in Domestic Fleet


Permian & DJ Basin TEC & Gauge Installation

  • Flanged Lubricator
  • Installed Live Well Conditions
  • 10K Flanged 3 Barrier Pack-Off Assembly
  • Pressure Differential Communication w/SCADA

Capillary & TEC Install Components

Single & Dual Top of Tree Pack-Off Designs

  • Threaded

  • Flanged

  • Single Barrier

  • Dual Barrier

  • 5K & 10K

Chemical Injection Valve or Pressure Gauge

  • Inconel Body

  • 17-4 Body

  • Inconel Spring

  • Carbide Ball & Seat

  • Proven Success

4' Sub Injection Mandrel - Certified Pressure Tested at Shop and Location


Reservoir Monitoring with Downhole Pressure & Temperature Gauges

Reservoir Evaluation

  • Real Time Pressure Draw Down
  • Optimize Well Spacing
  • Monitor Permeability
  • Evaluate Reservoir Decline

Production Evaluation

  • Efficiencies in Lifting Methods
  • Identify Depth of Gas Breakout
  • Ratios of Gas, Oil & Water
  • Identify Production Optimization

Completion Evaluation

  • Detection of Casing Leaks
  • Efficiency of Frac Jobs
  • Zone Performance and Isolation Results
  • Monitor Steam Injection Productivity

© Drover Energy Services, L.L.C.
Kilgore, TX 75662

Responsive website by GroupM7 Design™